Our projects
NEVADA / URANIUM + POTASSIUM + LITHIUM / PROPOSED DEVELOPMENT

Silver PeakA considered beginning.

Uranium, potassium and lithium exploration opportunities connect with a proposed campus and local processing concept. The development vision brings advanced geospatial insight, exploration and local processing together to build a new domestic minerals business.

Read the development plan
Silver Peak exploration facility entrance concept
Silver Peak Road / NV 265 corridorExplore. Verify. Develop.
Milieu Minerals shared Blender scene. Terrain-informed architectural concept.
700 m²Initial campus buildings
U02 targetMine-investigation concept
Local processingSelected development strategy
Evidence firstSeparate investment gates
DEVELOPMENT PHASECumulative site visibility
ONE CONNECTED DEVELOPMENT

From understanding
to a place in the ground.

A new perspective on the Nevada ground. A phased program links exploration, prospective mining and conditional local processing.

01 / CAMPUS

SPU-01 exploration campus

Three coordinated buildings bring geospatial interpretation, core analysis and secure sample management to a 3.90 hectare campus.

37.790407, -117.634206
02 / MINE

U02 mine investigation

U02 is the starting point for geological verification. The 9.545 ppm airborne eU response is a survey observation, not a chemical feed grade.

37.773748, -117.631339
03 / PROCESSING

P-B northern processing

A 12 hectare northern core reserves space for a conditional local mill, with a separate 40 hectare residue investigation area.

37.832674, -117.651500
Conditional mine and local mill$309.61M

Additional conditional scope.

All-stage funding$317.61M

Planning allowances in nominal 2026 USD.

Construction requires a defined mineral resource, positive project economics, site control, engineering and approvals.

A local processing ambition,
advanced through clear decisions.

Start with exploration, samples and verification. Expand when feed, metallurgy, access, engineering and commercial performance justify it. Licensed off-site recovery remains a benchmark and contingency. Ownership, permissions and construction are not established.

A coordinated architectural vision.

Silver Peak master model aerial